TIDC Projects

Desktop Only

Use filters at left to search for TIDC projects

Mobile Only

Use filters at the bottom to search for TIDC projects

Found 22 Results
Page 2 of 3

Project C11-2019: Development of a system-level distributed sensing technique for long- term monitoring of concrete and composite bridges


Development of a System-level Distributed Sensing Technique for Long-Term Monitoring of Concrete and Composite BridgesProject C11.2019

C11.2019 cover image

January 1, 2020


Project C07.2018: Alternative Cementitious Materials (ACMs) For Durable and Sustainable Transportation Infrastructures


Alternative Cementitious Materials (ACMs) For Durable and Sustainable Transportation Infrastructures Project C7.2018

June 1, 2019


Project C03.2018: Condition Assessment of Corroded Prestressed Concrete Bridge Girders


Condition Assessment of Corroded Prestressed Concrete Bridge Girders Project C3.2018

C3.2018 cover image

January 1, 2019


Project 2.07: High Performance Concrete with Post-Tensioning Shrinking Fibers


High Performance Concrete with Post-Tensioning Shrinking Fibers Project 2.7

2.07 cover image


Project 2.04: Thermoplastic Composites by 3D Printing and Automated Manufacturing to Extend the Life


Thermoplastic Composites by 3D Printing and Automated Manufacturing to Extend the Life of Transportation Facilities Project 2.4


Project 2.03: Measuring Adhesion Between Binders and Aggregates Using Particle Probe Scanning Force Microscopy at Low Temperatures


Measuring Adhesion Between Binders and Aggregates Using Particle Probe Scanning Force Microscopy at Low Temperatures Project 2.3


Project 1.04: Electromagnetic Detection and Identification of Concrete Cracking in Highway Bridges


Electromagnetic Detection and Identification of Concrete Cracking in Highway Bridges Project 1.4

1.4 cover image


Project 3.05: Prevention of Stressed-Induced Failures of Prestressed Concrete Crossties ofthe Railroad Track Structure: Phase I


Prevention of Stressed-Induced Failures of Prestressed Concrete Crossties of the Railroad Track Structure: Phase I Project 3.5

3.5 cover image

October 1, 2018


Project 2.05: Development and Testing of High/Ultra-High Early Strength Concrete for Durable Bridge Components and Connections


Development and Testing of High/Ultra-High Early Strength Concrete for Durable Bridge Components and Connections Project 2.5

2.5 cover image


Project 1.11: Energy Harvesting and Advanced Technologies for Enhanced Life


Energy Harvesting and Advanced Technologies for Enhanced Life Project 1.11

project 1.11 cover image

July 1, 2018


Page 2 of 3