Project 3.11: Assessment of Micropile-Supported Integral Abutment Bridges
Assessment of Micropile-Supported Integral Abutment Bridges PHASE 2: Flexural Strength and Durability of Micropile Threaded Connections Project 3.11 Project Summary Integral abutment bridges (IABs) are the preferred method of construction by Maine Department of Transportation (DOT) and other transportation agencies throughout the United States due to their durability and reduced upfront and life-cycle costs. Shallow […]
Read more






