TIDC Projects
Desktop Only
Use filters at left to search for TIDC projects
Mobile Only
Use filters at the bottom to search for TIDC projects
Page 2 of 2
Project 3.11:Assessment of Micropile-Supported Integral Abutment Bridges
Assessment of Micropile-Supported Integral Abutment Bridges PHASE 2: Flexural Strength and Durability of Micropile Threaded ConnectionsProject 3.11
September 1, 2019
Project 3.12: Lateral loading of unreinforced rigid elements and basal stability of column-supported systems
Lateral Loading of Unreinforced Rigid Elements and Basal Stability of Column-Supported Systems Project 3.12
June 1, 2019
Project 3.04: Testing, Monitoring and Analysis of FRP Girder Bridge with Concrete Deck
Testing, Monitoring and Analysis of FRP Girder Bridge with Concrete Deck Project 3.4
March 1, 2019
Project 3.05: Prevention of Stressed-Induced Failures of Prestressed Concrete Crossties ofthe Railroad Track Structure: Phase I
Prevention of Stressed-Induced Failures of Prestressed Concrete Crossties of the Railroad Track Structure: Phase I Project 3.5
October 1, 2018
Project 3.07: Development of general guidelines related to the effects of factors such asthe bridge span range, range of pile length, roadway profile grade,and skew angle range on integral abutment bridges (IABs)
Development of General Guidelines Related to the Effects of Factors Such as the Bridge Span Range, Range of Pile Length, Roadway Profile Grade, and Skew Angle Range on Integral Abutment Bridges (IABs) Project 3.7
July 1, 2018
Project 3.06: Optimal Design of Sustainable Asphalt Mixtures with RAP
Optimal Design of Sustainable Asphalt Mixtures with RAP Project 3.6
April 19, 2018
Project 3.08: Bridge Modal Identification via Video Processing and Quantification ofUncertainties
Bridge Modal Identification via Video Processing and Quantification of Uncertainties Project 3.8
January 1, 2018
Page 2 of 2