TIDC Projects
Desktop Only
Use filters at left to search for TIDC projects
Mobile Only
Use filters at the bottom to search for TIDC projects
Page 1 of 2
Project 2.20: Efficiency of Fiber Reinforcement in Ultra-high Performance Concrete
Efficiency of Fiber Reinforcement in Ultra-high Performance Concrete2.20
October 1, 2022
Project 3.17: Assessment of CT Girder Load Distribution and Web Buckling Through Field Load Testing and Finite-Element Analysis
Assessment of CT Girder Load Distribution and Web Buckling Through Field Load Testing and Finite-Element Analysis Project 3.17:
June 1, 2022
Project 3.21: GBeam Bridge Girder Pultrusion: Section Design and Optimization
GBeam Bridge Girder Pultrusion: Section Design and Optimization 3.21
Project 2.18: Recycling Large-Scale 3 D-Printed Polymer Composite Precast Concrete Forms
Recycling Large-Scale 3 D-Printed Polymer Composite Precast Concrete Forms 2.18
January 1, 2022
Project 2.17: Design and Development of High-Performance Composites for Improved Durability of Bridges in Rhode Island
Design and Development of High-Performance Compositesfor Improved Durability of Bridges in Rhode Island Project 2.17
Project 3.16: CT bridge girder sections with precast decks and FRP girder-deck shear
connectors CT Bridge Girder Sections with Precast Decks and FRP Girder-Deck ShearConnectors Project 3.16
October 15, 2021
Project 2.11: Culvert Rehabilitation using 3D Printed Diffusers
Culvert Rehabilitation using 3D Printed Diffusers Project 2.11
October 1, 2020
Project 3.14: FRP-Concrete Hybrid Composite Girder Systems: Web Shear Strength and Design Guide Development
FRP-Concrete Hybrid Composite Girder Systems: Web Shear Strength and Design Guide Development FRP-Concrete Hybrid Composite Girder Systems: Web Shear Strength and Design Guide Development Project 3.14
August 19, 2020
Project 3.10: Assessment and optimization of double CT bridge girder sections with
longitudinal precast decks Assessment and Optimization of Double Ct Bridge Girder Sections With Longitudinal Precast Decks Project 3.10
July 1, 2020
Project C11-2019: Development of a system-level distributed sensing technique for long- term monitoring of concrete and composite bridges
Development of a System-level Distributed Sensing Technique for Long-Term Monitoring of Concrete and Composite Bridges Project C11.2019
January 1, 2020
Page 1 of 2