TIDC Projects

Desktop Only

Use filters at left to search for TIDC projects

Mobile Only

Use filters at the bottom to search for TIDC projects

Found 16 Results
Page 1 of 2

Project 2.20: Efficiency of Fiber Reinforcement in Ultra-high Performance Concrete


Efficiency of Fiber Reinforcement in Ultra-high Performance Concrete2.20

October 1, 2022


Project 3.17: Assessment of CT Girder Load Distribution and Web Buckling Through Field Load Testing and Finite-Element Analysis


Assessment of CT Girder Load Distribution and Web Buckling Through Field Load Testing and Finite-Element Analysis Project 3.17:

sensor placement under grist mill bridge

June 1, 2022


Project 3.21: GBeam Bridge Girder Pultrusion: Section Design and Optimization


GBeam Bridge Girder Pultrusion: Section Design and Optimization 3.21


Project 2.18: Recycling Large-Scale 3 D-Printed Polymer Composite Precast Concrete Forms


Recycling Large-Scale 3 D-Printed Polymer Composite Precast Concrete Forms 2.18

2.18 cover image

January 1, 2022


Project 2.16: Enhancing the Durability of Bridge Decks by Incorporating Microencapsulated Phase Change Materials (PCMs) in Concrete


Enhancing the Durability of Bridge Decks by Incorporating Microencapsulated Phase Change Materials (PCMs) in Concrete Project 2.16

Project 2.16 Cover Image


Project 2.17: Design and Development of High-Performance Composites for Improved Durability of Bridges in Rhode Island


Design and Development of High-Performance Compositesfor Improved Durability of Bridges in Rhode Island Project 2.17

2.17 cover image


Project 3.16: CT bridge girder sections with precast decks and FRP girder-deck shear


connectors CT Bridge Girder Sections with Precast Decks and FRP Girder-Deck ShearConnectors Project 3.16

3.16 cover image

October 15, 2021


Project 2.14: Implementation of UHPC Technology into the New England Construction Industry


Implementation of UHPC Technology into the New England Construction Industry Project 2.14

2.14 cover image

October 1, 2021


Project 2.12: Evaluation of Processed Glass Aggregate for Utilization in Transportation Projects as A Sand Burrow.


Evaluation of Processed Glass Aggregate for Utilization in Transportation Projects as A Sand Burrow. Project 2.12

2.12 cover image

October 1, 2020


Project 3.10: Assessment and optimization of double CT bridge girder sections with


longitudinal precast decks Assessment and Optimization of Double Ct Bridge Girder Sections With Longitudinal Precast Decks Project 3.10

3.10 cover image

July 1, 2020


Page 1 of 2