TIDC Projects

Desktop Only

Use filters at left to search for TIDC projects

Mobile Only

Use filters at the bottom to search for TIDC projects

Found 35 Results
Page 1 of 4

Project 1.21:Efficient and Cost-effective Rating of Critical Members of Steel Truss Railroad Bridges Supported by Field Test Data


Efficient and Cost-effective Rating of Critical Members of Steel Truss Railroad Bridges Supported by Field Test DataProject 1.21

October 1, 2023


Project C21.2022: Prediction and Prevention of Bridge Performance Degradation due to Corrosion, Material Loss, and Microstructural Changes.


Prediction and Prevention of Bridge Performance Degradation due to Corrosion, Material Loss, and Microstructural Changes C21.2022

June 3, 2022


Project 3.17: Assessment of CT Girder Load Distribution and Web Buckling Through Field Load Testing and Finite-Element Analysis


Assessment of CT Girder Load Distribution and Web Buckling Through Field Load Testing and Finite-Element Analysis Project 3.17:

sensor placement under grist mill bridge

June 1, 2022


Project 3.21: GBeam Bridge Girder Pultrusion: Section Design and Optimization


GBeam Bridge Girder Pultrusion: Section Design and Optimization 3.21


Project 3.19: Detection and Monitoring of Material Aging and Structural Deterioration using Electromagnetic and Mechanical Sensors with Virtual Reality and Machine Learning Modeling


Detection and Monitoring of Material Aging and Structural Deterioration using Electromagnetic and Mechanical Sensors with Virtual Reality and Machine Learning Modeling Project 3.19


Project 3.18: Steel-Free Concrete Bridge Decks


Steel-Free Concrete Bridge Decks Project 3.18:

3.18 cover image


Project 3.20: Analysis of MaineDOT Road and Bridge Infrastructure Construction Costs


Analysis of MaineDOT Road and Bridge Infrastructure Construction Costs Project 3.20

February 7, 2022


Project 2.16: Enhancing the Durability of Bridge Decks by Incorporating Microencapsulated Phase Change Materials (PCMs) in Concrete


Enhancing the Durability of Bridge Decks by Incorporating Microencapsulated Phase Change Materials (PCMs) in Concrete Project 2.16

Project 2.16 Cover Image

January 1, 2022


Project 2.17: Design and Development of High-Performance Composites for Improved Durability of Bridges in Rhode Island


Design and Development of High-Performance Compositesfor Improved Durability of Bridges in Rhode Island Project 2.17

2.17 cover image


Project 3.16: CT bridge girder sections with precast decks and FRP girder-deck shear


connectors CT Bridge Girder Sections with Precast Decks and FRP Girder-Deck ShearConnectors Project 3.16

3.16 cover image

October 15, 2021


Page 1 of 4