TIDC Projects
Desktop Only
Use filters at left to search for TIDC projects
Mobile Only
Use filters at the bottom to search for TIDC projects
Page 6 of 8
Project 1.15: Non-Contact Intelligent Inspection of Infrastructure
Non-Contact Intelligent Inspection of Infrastructure Project 1.15 Project Summary The objective of this research is to develop non-contact sensing mechanism for infrastructure monitoring as well as the associated machine-learning based technique for decision making. Currently available sensory systems for structural health monitoring are almost all based on transducers that are directly attached to or embedded […]

October 1, 2021
Project 1.16: Wireless Joint Monitoring System (w-JMS) for Safety of Highway Bridges
Wireless Joint Monitoring System (w-JMS) for Safety of Highway Bridges Project 1.16 Project Summary The objective of this research project is to develop and deploy a long-term wireless monitoring system on a highway bridge’s expansion joint systems considering environmental factors. Principal Investigator:Dr. Shinae Jang Co-PIs Dr. Song HanDr. Ramesh Malla Institution:University of Connecticut Project:Complete Start […]

Project 2.15: Incorporation of Pollinator Plantings to Enhance Ecosystem Functions and Durability of Transportation Right-of-Way Infrastructure
Incorporation of Pollinator Plantings to Enhance Ecosystem Functions and Durability of Transportation Right-of-Way Infrastructure Project 2.15 Project Summary Highway right-of-ways (ROWs) provide numerous ecosystem services beyond erosion control. Incorporation of native grasses and flowering plants into ROW plantings can further increase the services by providing habitat for endangered native pollinators while improving aesthetics, erosion control, […]

Project 3.16: CT bridge girder sections with precast decks and FRP girder-deck shear
CT Bridge Girder Sections with Precast Decks and FRP Girder-Deck ShearConnectors Project 3.16 Project Summary UMaine recently developed and commercialized, in partnership with AIT Bridges, a novel, fiber‐reinforced polymer (FRP) composite bridge girder. This project focuses on the assessment of the fiber‐reinforced polymer tub girder (CT girder) with precast concrete decks and new, FRP girder‐deck […]

October 15, 2021
Project 2.17: Design and Development of High-Performance Composites for Improved Durability of Bridges in Rhode Island
Design and Development of High-Performance Compositesfor Improved Durability of Bridges in Rhode Island Project 2.17 Project Summary Transportation infrastructure is the backbone of our economy. But the current condition of America’s deteriorating transportation infrastructure network has raised serious concerns on safety, quality of life, and economic impacts. According to the recent American Society of Civil […]

January 1, 2022
Project 2.16: Enhancing the Durability of Bridge Decks by Incorporating Microencapsulated Phase Change Materials (PCMs) in Concrete
Enhancing the Durability of Bridge Decks by Incorporating Microencapsulated Phase Change Materials (PCMs) in Concrete Project 2.16 Project Summary In Rhode Island and other New England states, combined effects of freeze-thaw-induced damage and chloride ingress (from deicing salts) make it very challenging to maintain the quality of concrete on bridges and road surfaces. This project […]

Project 2.18: Recycling Large-Scale 3 D-Printed Polymer Composite Precast Concrete Forms
Recycling Large-Scale 3 D-Printed Polymer Composite Precast Concrete Forms Project 2.18 Project Summary Large-scale thermoplastic composite extrusion-based 3D printing has been used in research labs and is moving into industry. One significant use of large-scale 3D printing has been to make forms for manufacturing precast concrete parts. Once the forms have been used for casting […]

Project 1.14: Exploring the Safety Impact of Rumble Strips on Prevention of Lane Departure Crashes in Maine
Exploring the Safety Impact of Rumble Strips on Prevention ofLane Departure Crashes in Maine Project 1.14 Project Summary Enhancing safety of roadway segments is a critical step towards maintaining durable transportation infrastructures. Due to significant costs associated with construction of roadway segments, redesigning or rebuilding a roadway segment is not always a viable solution for […]

Project 3.20: Analysis of MaineDOT Road and Bridge Infrastructure Construction Costs
Analysis of MaineDOT Road and Bridge Infrastructure Construction Costs Project 3.20 Project Summary Maine Department of Transportation (MaineDOT) has been experiencing increasing costs in bids received for bridge repair, road paving and other infrastructure construction projects. This was first observed for bridges in the Fall of 2018 and paving in the spring 2019. Moreover, for […]

February 7, 2022
Project 3.18: Steel-Free Concrete Bridge Decks
Steel-Free Concrete Bridge Decks Project 3.18: Project Summary In order to realize a potentially transformational improvement in concrete bridge deck durability, the proposed research program intends to validate a deck design by which little to no conventional reinforcement is required. The design relies on the development of so-called arching action to maintain compressive stresses in […]

June 1, 2022
Page 6 of 8
