TIDC Projects

Desktop Only

Use filters at left to search for TIDC projects

Mobile Only

Use filters at the bottom to search for TIDC projects

Found 71 Results
Page 2 of 8

Project 3.19: Detection and Monitoring of Material Aging and Structural Deterioration using Electromagnetic and Mechanical Sensors with Virtual Reality and Machine Learning Modeling


Detection and Monitoring of Material Aging and Structural Deterioration using Electromagnetic and Mechanical Sensors with Virtual Reality and Machine Learning ModelingProject 3.19

June 1, 2022


Project 3.18: Steel-Free Concrete Bridge Decks


Steel-Free Concrete Bridge Decks Project 3.18:

3.18 cover image


Project 3.20: Analysis of MaineDOT Road and Bridge Infrastructure Construction Costs


Analysis of MaineDOT Road and Bridge Infrastructure Construction Costs Project 3.20

February 7, 2022


Project 1.14: Exploring the Safety Impact of Rumble Strips on Prevention of Lane Departure Crashes in Maine


Exploring the Safety Impact of Rumble Strips on Prevention ofLane Departure Crashes in Maine Project 1.14

January 1, 2022


Project 2.18: Recycling Large-Scale 3 D-Printed Polymer Composite Precast Concrete Forms


Recycling Large-Scale 3 D-Printed Polymer Composite Precast Concrete Forms 2.18

2.18 cover image


Project 2.16: Enhancing the Durability of Bridge Decks by Incorporating Microencapsulated Phase Change Materials (PCMs) in Concrete


Enhancing the Durability of Bridge Decks by Incorporating Microencapsulated Phase Change Materials (PCMs) in Concrete Project 2.16

Project 2.16 Cover Image


Project 2.17: Design and Development of High-Performance Composites for Improved Durability of Bridges in Rhode Island


Design and Development of High-Performance Compositesfor Improved Durability of Bridges in Rhode Island Project 2.17

2.17 cover image


Project 3.16: CT bridge girder sections with precast decks and FRP girder-deck shear


connectors CT Bridge Girder Sections with Precast Decks and FRP Girder-Deck ShearConnectors Project 3.16

3.16 cover image

October 15, 2021


Project 2.15: Incorporation of Pollinator Plantings to Enhance Ecosystem Functions and Durability of Transportation Right-of-Way Infrastructure


Incorporation of Pollinator Plantings to Enhance Ecosystem Functions and Durability of Transportation Right-of-Way Infrastructure Project 2.15

2.15 cover image

October 1, 2021


Project 1.16: Wireless Joint Monitoring System (w-JMS) for Safety of Highway Bridges


Wireless Joint Monitoring System (w-JMS) for Safety of Highway Bridges Project 1.16

1.16 cover image


Page 2 of 8