Project 2.15: Incorporation of Pollinator Plantings to Enhance Ecosystem Functions and Durability of Transportation Right-of-Way Infrastructure

Incorporation of Pollinator Plantings to Enhance Ecosystem Functions and Durability of Transportation Right-of-Way Infrastructure

Project 2.15

Project Summary

Highway right-of-ways (ROWs) provide numerous ecosystem services beyond erosion control. Incorporation of native grasses and flowering plants into ROW plantings can further increase the services by providing habitat for endangered native pollinators while improving aesthetics, erosion control, and stormwater filtration. However, highway ROWs are not natural habitats. The roadway itself alters the micro-climate of the roadside, and safety considerations require much of the ROW to be maintained as grassland or scrubland. In New England these are early succession ecosystems and must be regularly mowed or otherwise disturbed. Many New England wildflowers are not adapted to the roadside environment, while wildflowers used on roadsides in other regions are not native in New England and may not be adapted to the soils or climate. This project will use vegetation surveys and adaptation trials to identify native and naturalized flowering plants adapted to the highway ROW environment, and will create trial plantings in the highway ROW to identify best practices for establishing native grasses and forbs from seed on the roadside. Roadsides have been successfully maintained as habitat for native plants, pollinators, small animals and birds in other regions but very little management of roadside for habitat has occurred in New England. Best practices from other regions need to be tested to determine whether they are appropriate in New England since soils, climate, and native species differ. Trial plantings will be established in partnership with RIDOT Maintenance to ensure that the establishment methods used are possible with the equipment and employee skills available.

Principal Investigator

Dr, Rebecca Brown

Institution:

University of Rhode Island

Project Status

Active

Project Cost

$324,765

Start Date

10/01/2021

Project Type

Base-funded

End Date

07/30/2024

Agency ID

69A3551847101

Sponsors:

Office of the Assistant Secretary for Research and Technology, University Transportation Centers Program, Department of Transportation
University of Rhode Island
Rhode Island Department of Transportation

Implementation of Research Outcomes:

This project is in its initial research phase. Implementation of Research
outcomes will be reported upon completion of initial research.

Impacts and Benefits of Implementation:

This project is in its initial research phase. Impacts and benefits of the research
will be reported after the implementation phase.

Printable Project Information Sheet

September 2021 Quarterly Progress Report

December 2021 Quarterly Progress Report

March 2022 Quarterly Progress Report

June 2022 Quarterly Progress Report

September 2022 Quarterly Progress Report