TIDC Projects

Desktop Only

Use filters at left to search for TIDC projects

Mobile Only

Use filters at the bottom to search for TIDC projects

Found 13 Results
Page 1 of 2

Project 2.20: Efficiency of Fiber Reinforcement in Ultra-high Performance Concrete


Efficiency of Fiber Reinforcement in Ultra-high Performance Concrete2.20

October 1, 2022


Project 3.17: Assessment of CT Girder Load Distribution and Web Buckling Through Field Load Testing and Finite-Element Analysis


Assessment of CT Girder Load Distribution and Web Buckling Through Field Load Testing and Finite-Element Analysis Project 3.17:

sensor placement under grist mill bridge

June 1, 2022


Project 3.21: GBeam Bridge Girder Pultrusion: Section Design and Optimization


GBeam Bridge Girder Pultrusion: Section Design and Optimization 3.21


Project 2.18: Recycling Large-Scale 3 D-Printed Polymer Composite Precast Concrete Forms


Recycling Large-Scale 3 D-Printed Polymer Composite Precast Concrete Forms 2.18

2.18 cover image

January 1, 2022


Project 2.17: Design and Development of High-Performance Composites for Improved Durability of Bridges in Rhode Island


Design and Development of High-Performance Compositesfor Improved Durability of Bridges in Rhode Island Project 2.17

2.17 cover image


Project 3.16: CT bridge girder sections with precast decks and FRP girder-deck shear


connectors CT Bridge Girder Sections with Precast Decks and FRP Girder-Deck ShearConnectors Project 3.16

3.16 cover image

October 15, 2021


Project 2.11: Culvert Rehabilitation using 3D Printed Diffusers


Culvert Rehabilitation using 3D Printed Diffusers Project 2.11

October 1, 2020


Project 3.14: FRP-Concrete Hybrid Composite Girder Systems: Web Shear Strength and Design Guide Development


FRP-Concrete Hybrid Composite Girder Systems: Web Shear Strength and Design Guide Development FRP-Concrete Hybrid Composite Girder Systems: Web Shear Strength and Design Guide Development Project 3.14

3.14 cover image

August 19, 2020


Project 3.10: Assessment and optimization of double CT bridge girder sections with


longitudinal precast decks Assessment and Optimization of Double Ct Bridge Girder Sections With Longitudinal Precast Decks Project 3.10

3.10 cover image

July 1, 2020


Project C11-2019: Development of a system-level distributed sensing technique for long- term monitoring of concrete and composite bridges


Development of a System-level Distributed Sensing Technique for Long-Term Monitoring of Concrete and Composite Bridges Project C11.2019

C11.2019 cover image

January 1, 2020


Page 1 of 2