Project 3.20: Analysis of MaineDOT Road and Bridge Infrastructure Construction Costs
Analysis of MaineDOT Road and Bridge Infrastructure Construction Costs Project 3.20
Read more
Analysis of MaineDOT Road and Bridge Infrastructure Construction Costs Project 3.20
Read more
Analysis of Covid-19 and Travel In Maine (ACTIME) Validation Study Project 4.9
Read more
Safety Assessment of New England Roadways during the COVID-19 Pandemic Project 4.11
Read more
FRP-Concrete Hybrid Composite Girder Systems: Web Shear Strength and Design Guide Development FRP-Concrete Hybrid Composite Girder Systems: Web Shear Strength and Design Guide Development Project 3.14
Read more
Road Salt Impact Assessment (Safety Study) Project 4.10
Read more
longitudinal precast decks Assessment and Optimization of Double Ct Bridge Girder Sections With Longitudinal Precast Decks Project 3.10
Read more
A New Method of Determining Payment for In-Place Concrete with Double-Bounded Compressive Strength Pay Factors Project C9.2019
Read more
Leveraging High-Resolution LiDAR and Stream Geomorphic Assessment Datasets to Expand Regional Hydraulic Geometry Curves for Vermont: A Blueprint for New England States Project C5.2018
Read more
Testing, Monitoring and Analysis of FRP Girder Bridge with Concrete Deck Project 3.4
Read more
Condition/Health Monitoring of Railroad Bridges for Structural Safety, Integrity, and Durability Project 1.2
Read more