TIDC Projects

Desktop Only

Use filters at left to search for TIDC projects

Mobile Only

Use filters at the bottom to search for TIDC projects

Found 17 Results
Page 1 of 2

Project 3.08: Bridge Modal Identification via Video Processing and Quantification ofUncertainties


Bridge Modal Identification via Video Processing and Quantification of Uncertainties Project 3.8

3.8 cover image

January 1, 2018


Project 3.06: Optimal Design of Sustainable Asphalt Mixtures with RAP


Optimal Design of Sustainable Asphalt Mixtures with RAP Project 3.6

April 19, 2018


Project 3.07: Development of general guidelines related to the effects of factors such asthe bridge span range, range of pile length, roadway profile grade,and skew angle range on integral abutment bridges (IABs)


Development of General Guidelines Related to the Effects of Factors Such as the Bridge Span Range, Range of Pile Length, Roadway Profile Grade, and Skew Angle Range on Integral Abutment Bridges (IABs) Project 3.7

July 1, 2018


Project 3.05: Prevention of Stressed-Induced Failures of Prestressed Concrete Crossties ofthe Railroad Track Structure: Phase I


Prevention of Stressed-Induced Failures of Prestressed Concrete Crossties of the Railroad Track Structure: Phase I Project 3.5

3.5 cover image

October 1, 2018


Project 3.04: Testing, Monitoring and Analysis of FRP Girder Bridge with Concrete Deck


Testing, Monitoring and Analysis of FRP Girder Bridge with Concrete Deck Project 3.4

March 1, 2019


Project 3.12: Lateral loading of unreinforced rigid elements and basal stability of column-supported systems


Lateral Loading of Unreinforced Rigid Elements and Basal Stability of Column-Supported Systems Project 3.12

Project 3.12 Cover Image

June 1, 2019


Project 3.11:Assessment of Micropile-Supported Integral Abutment Bridges


Assessment of Micropile-Supported Integral Abutment Bridges PHASE 2: Flexural Strength and Durability of Micropile Threaded Connections Project 3.11

3.11 cover image

September 1, 2019


Project 3.10: Assessment and optimization of double CT bridge girder sections with longitudinal precast decks


Assessment and Optimization of Double Ct Bridge Girder Sections With Longitudinal Precast Decks Project 3.10

3.10 cover image

July 1, 2020


Project 3.14: FRP-Concrete Hybrid Composite Girder Systems: Web Shear Strength and Design Guide Development


FRP-Concrete Hybrid Composite Girder Systems: Web Shear Strength and Design Guide Development Project 3.14

3.14 cover image

August 19, 2020


Project 3.13: Investigating the Effectiveness of Enzymatic Stabilizers for Reclaimed Stabilized


Base Projects Investigating the Effectiveness of Enzymatic Stabilizers for Reclaimed StabilizedBase Projects Project 3.13

October 1, 2020


Page 1 of 2