TIDC Projects
Desktop Only
Use filters at left to search for TIDC projects
Mobile Only
Use filters at the bottom to search for TIDC projects
Page 1 of 8
Project 3.08: Bridge Modal Identification via Video Processing and Quantification ofUncertainties
Bridge Modal Identification via Video Processing and Quantification of UncertaintiesProject 3.8
January 1, 2018
Project 3.06: Optimal Design of Sustainable Asphalt Mixtures with RAP
Optimal Design of Sustainable Asphalt Mixtures with RAP Project 3.6
April 19, 2018
Project 1.01: Field Live Load Testing and Advanced Analysis of Concrete T-Beam
Field Live Load Testing and Advanced Analysis of Concrete T-Beam Bridges to Extend Service Life Project 1.1
July 1, 2018
Project 2.01: Asphalt Mixtures with Crumb Rubber Modifier for Longevity and Environment
Asphalt Mixtures with Crumb Rubber Modifier for Longevity and Environment Project 2.1
Project 1.08: Enhancing Intelligent Compaction with Passive Wireless Sensors
Enhancing Intelligent Compaction with Passive Wireless Sensors Project 1.8
Project 1.11: Energy Harvesting and Advanced Technologies for Enhanced Life
Energy Harvesting and Advanced Technologies for Enhanced Life Project 1.11
Project 3.07: Development of general guidelines related to the effects of factors such asthe bridge span range, range of pile length, roadway profile grade,and skew angle range on integral abutment bridges (IABs)
Development of General Guidelines Related to the Effects of Factors Such as the Bridge Span Range, Range of Pile Length, Roadway Profile Grade, and Skew Angle Range on Integral Abutment Bridges (IABs) Project 3.7
Project 4.04: Bridge-stream network assessment to identify sensitive structural, hydraulic
and landscape parameters for planning flood mitigation Bridge-Stream Network Assessment to Identify Sensitive Structural, Hydraulic and Landscape Parameters for Planning Flood Mitigation Project 4.4
Project 4.01: Connected Vehicles Applications to Improve Infrastructure Safety and Durability
Connected Vehicles Applications to Improve Infrastructure Safety and Durability Project 4.01
September 1, 2018
Project 2.09: Carbonating Subgrate Materials For In Situ Soil Stabilization
Carbonating Subgrade Materials for In Situ Soil Stabilization Project 2.9
Page 1 of 8