TIDC Projects

Desktop Only

Use filters at left to search for TIDC projects

Mobile Only

Use filters at the bottom to search for TIDC projects

Found 22 Results
Page 1 of 3

Project 2.20: Efficiency of Fiber Reinforcement in Ultra-high Performance Concrete


Efficiency of Fiber Reinforcement in Ultra-high Performance Concrete2.20

October 1, 2022


Project 3.18: Steel-Free Concrete Bridge Decks


Steel-Free Concrete Bridge Decks Project 3.18:

3.18 cover image

June 1, 2022


Project 2.18: Recycling Large-Scale 3 D-Printed Polymer Composite Precast Concrete Forms


Recycling Large-Scale 3 D-Printed Polymer Composite Precast Concrete Forms 2.18

2.18 cover image

January 1, 2022


Project 2.16: Enhancing the Durability of Bridge Decks by Incorporating Microencapsulated Phase Change Materials (PCMs) in Concrete


Enhancing the Durability of Bridge Decks by Incorporating Microencapsulated Phase Change Materials (PCMs) in Concrete Project 2.16

Project 2.16 Cover Image


Project 2.14: Implementation of UHPC Technology into the New England Construction Industry


Implementation of UHPC Technology into the New England Construction Industry Project 2.14

2.14 cover image

October 1, 2021


Project C17:2020: Durability of Modified Helical Piles Under Lateral and Torsional Loads: Embracing Efficient Foundation Alternatives to Support Lightweight Transportation Structures


Durability of Modified Helical Piles Under Lateral and Torsional Loads: Embracing Efficient Foundation Alternatives to Support Lightweight Transportation Structures Project C17.2020

January 1, 2021


Project 2.11: Culvert Rehabilitation using 3D Printed Diffusers


Culvert Rehabilitation using 3D Printed Diffusers Project 2.11

October 1, 2020


Project 2.13: Performance Structural Concrete Optimized for Cost, Durability and Manufacturability


Performance Structural Concrete Optimized for Cost, Durability and Manufacturability Project 2.13

2.13 cover image


Project C09.2019: A New Method of Determining Payment for In-Place Concrete with Double- Bounded Compressive Strength Pay Factors


A New Method of Determining Payment for In-Place Concrete with Double-Bounded Compressive Strength Pay Factors Project C9.2019

April 1, 2020


Project 2.02: Concrete Systems for a 100-Year Design Life


Concrete Systems for a 100-Year Design Life Project 2.2

2.02 cover image

March 1, 2020


Page 1 of 3