TIDC Projects

Desktop Only

Use filters at left to search for TIDC projects

Mobile Only

Use filters at the bottom to search for TIDC projects

Found 13 Results
Page 2 of 2

Project 3.04: Testing, Monitoring and Analysis of FRP Girder Bridge with Concrete Deck


Testing, Monitoring and Analysis of FRP Girder Bridge with Concrete DeckProject 3.4

image of girders being placed by a crane at the Grist Mill Bridge location

March 1, 2019


Project 3.07: Development of general guidelines related to the effects of factors such asthe bridge span range, range of pile length, roadway profile grade,and skew angle range on integral abutment bridges (IABs)


Development of General Guidelines Related to the Effects of Factors Such as the Bridge Span Range, Range of Pile Length, Roadway Profile Grade, and Skew Angle Range on Integral Abutment Bridges (IABs) Project 3.7

July 1, 2018


Project 3.06: Optimal Design of Sustainable Asphalt Mixtures with RAP


Optimal Design of Sustainable Asphalt Mixtures with RAP Project 3.6

April 19, 2018


Page 2 of 2