TIDC Projects
Desktop Only
Use filters at left to search for TIDC projects
Mobile Only
Use filters at the bottom to search for TIDC projects
Found 13 Results
Page 2 of 2
Page 2 of 2
Page 2 of 2
Project 3.04: Testing, Monitoring and Analysis of FRP Girder Bridge with Concrete Deck
Testing, Monitoring and Analysis of FRP Girder Bridge with Concrete DeckProject 3.4
March 1, 2019
Project 3.07: Development of general guidelines related to the effects of factors such asthe bridge span range, range of pile length, roadway profile grade,and skew angle range on integral abutment bridges (IABs)
Development of General Guidelines Related to the Effects of Factors Such as the Bridge Span Range, Range of Pile Length, Roadway Profile Grade, and Skew Angle Range on Integral Abutment Bridges (IABs) Project 3.7
July 1, 2018
Project 3.06: Optimal Design of Sustainable Asphalt Mixtures with RAP
Optimal Design of Sustainable Asphalt Mixtures with RAP Project 3.6
April 19, 2018
Page 2 of 2